Pneumatic ball valve installation process and Precautions Pneumatic ball valve installation process and Precautions
Pneumatic Ball Valve installation shall be in strict accordance with product instructions on the installation processes, the following details pneumatic valve in the installation of specific practices, including the installation, operation during the installation process and note:
Pneumatic ball valve flange end installed on both sides before removing its protective cover, the valve is fully open state to wash clean; should be required to signal (electric or gas) to machine testing, to prevent vibration of the transport performance , after passing the on-line installation (wiring by electric actuator circuit diagrams); preparation and pipe connections, it shall be washed and cleaned of impurities remaining pipeline, these substances may damage the valve seat and ball.
Pneumatic ball valve during installation, please do not use the valve actuator as the lifting of the lifting part of the point, in order to avoid damage to the implementing agencies and accessories; Pneumatic Ball Valve in the pipeline should be installed horizontally or vertically; installation of the pipeline should not be near the phenomenon of lowered or external force can be used to pipe support or supports to eliminate the deviation of the pipeline.